Geological
& Geo-technical Assessment of the subsea
Executive
Summary
National
Institute of Ocean Technology (NIOT) as a follow up of the earlier
survey caried out, detailed Geological & Geo-technical
operations in the Sethusamuthram Channel Project. Earlier 40
locations were identified for Vibro core operations.
However, NIOT carried out 44 Vibro coring operations by deploying
6m long core lines with a very specially designed "A"
frame on board vessel Shiva-I. As agreed with the
principles, 4 land bore holes were drilled in the island area
forming part of the Adam's bridge and 6 bore holes were drilled in
the proposed channel alignment in zone of Adam's bridge.
Samples
were collected sectorwise. In sector AB, 4 vibro cores were
collected wherein the measured water depth at the time of
collection varied from 6.5m to 9.1m. The recovery of cores
varied from 0.5 to 1.8m. In general, the top layer is medium
to fine sand. Vibro core AB1 and AB3, intersected hard
strata along with sand at depth. The area being shallower
than the required 12m, would require higher dredge, operations
including probably in hard formations. In sector BC, 6 Vibro
cores are collected wherein the water level varied from 8m to
12m and the core recovery from Nil to as much as of 2.6m.
Most of the Vibro core had sandy strata. On top we find sandy to
clayey sand. In VC BC-6 to BC-3 at depth calcareous stone
was intersected. In VC BC-1 only, there are no core
recovery, inspite of repeated attempts, few pieces of hard shell
bed was collected right on the sea bed surface. Here also,
the dredging may have to be carried out to obtain the desired
depth of 12m.
In
sector CD, 8 Vibro cores were collected where in water level
varied from 12.7 to 13.38 m. The core recovery varied from
1.10 to 2.35m. All the Vibro cores intersected, softy clay
at the top and medium to stiffy clay at depth. In the
present scenario this sector may not require dredging. The
details gathered will be useful when the project authorities go
for deepening of the channel. Regarding sector DE a total of
11 vibro cores were collected with the water level varying from
12.5m to 13.5m. All the vibro cores intersected, soft clay
at top and medium stiff to stiff clay at depth. Only in DE2
along with clay, small pieces of rocks were obtained at the
bottom. In sector EE4 a total of 13 vibro cores were
collected. The measured water level varied from 7.00 to
12.10 m. The S-W part vibro cores intersected mostly clay at
the top and at the bottom, excepting vibro core EE4/3A and EE4/3B
where at the bottom calcareous stone were collected. The
vibro cores in the northern sector had mostly sandy clay on top
and sand strata with sand stone at depth excepting EE4/7A had
intersected sand stones pieces in depth. Vibro core EE4/1,
EE4/9 and EE4/13 met with calcareous sand stone at the
bottom. All the cores collected were analysed for their
geo-technical properties. Some of the core samples were
tested for their calcium carbonate content and for their organic
content, the details are given in the table in the report
separately.
Four
(4) land Bore Holes were drilled in the various islands on either
side of the proposed channel area adjoining the Adam's bridge
area. In Bore Hole 11 from 4.5 to 6.5m calcareous sand
stone and rock pieces along with clay and sand in this Bore Hole
were encountered. N value based on SPT test varied, from 9 -
100. In Bore Hole 4 between 4.5 and 7.5 m peices of
calcareous rock occur along with the calcareous sand and in
between 7.5 and 12m pieces of sand stones in the clayey
silt. The N values here vary from 9 to as high as 76.
In BH1 between depth 7.5 to 10.5m calcareous stone pieces
were met with. From 10.5 to 12m it intersected rock pieces
and calcareous sand stones. The N vale varied from 9 to
51. Again sand with rock pieces was met with between
15 and 16.5m. Beyond this the strata is seen to be sandy
upto 21m. In BH2 from 9-12m, it is clay with pieces of
calcareous sand stones and between 12 and 13.5m, hard
formation containing calcareous sand stones / coral,
etc. Again between 17 and 19.5m there are sand stones and
coral pieces with sand. The BH ended with the silty sand at
21m. The hard formation with clay occurs in the Bore Hole at
greater depth than in the seabed where this occurrence is shallow
and at less than 2m below the sea bed which has caused either
bending of the core barrel or damaging the core catcher.
These aspects should be taken into consideration which planning
for dredge operations.
In
the offshore domain 6 Bore holes were drilled along the proposed
channel alignment in the water depth of 2 to 6m in Zone A, Adam's
Bridge.
Bore
Hole No.5: In the bore hole sand met at depth from
the seabed to 9m and the SPT N values varied from 14 to 33.
Between 9m - 12m coral rock with thin partings of sands are
seen. Coral rock within sand partings occur between 12.5 to
14m. Alternate sequence of sand and coral rocks occur
between depths 14 to 18m. Between 18 to 22m clayey silt with
sand stone pieces are met.
Bore
Hole No.5: In this bore hole sands are reported
uopto 6m below the sea bed. Between 6 to 9m coral rock with
sand layers occur. Between 9 to 15m silty sands with gravel
occur. Coral rocks occurs between 15 to 16m. Beyond
16.5 m mainly sands are encountered. The SPT values varied
in general form 19 to 54.
Bore
Hole No.7: The top 6m below sea bed sands are
intersected for which the SPT N values varied between 26 to
44. Gravel pieces with sands are intersected between 6 to
7.5m depth. Between 7/5m to 13m mainly sands are intersected
for which SPT N values are of the order of 5 to 43. An
alternating sequences of coral rocks and sands are intersected
between 13m to 21m for which high order of SPT N values are
recorded.
Bore
Hole No.7A: In this Bore hole sands met at depth
from the seabed to 7/9m and SPT N values varies from 10 to
37. Between 7.9 to 9.5m coral rock with thin parting of sand
are seen. Silty sands occur between 9.5m to 12m.
Alternate sequences of sands and coral rocks occur between depths
12m to 23.5m.
Bore
Hole No.8: In Bore hole sands are reported at depth
6m below the seabed. Between 6 to 10m coral rock with thin
sand layers occurs. Between 10 to 12m sand with gravel
pieces. Coral rock occurs between 12 to 15m. Beyond
15m upto 23m, mainly sands are encountered. The SPT N values
varies in general from 12 to 57.
Bore
Hole No.10: This bore hole were drilled upto 4.5m
from the seabed. This bore hole were mainly silty
sand. The SPT N valese were 6 and 9.